Many things have changed on the project since last time I posted. We have the entire addition framed and many of the new openings framed in the existing house. The roof has ice and water shield on it so we can stay dry now. I also had Mauro and his crew on site again to form and pour the steps and the garage slab. The HVAC rough in is almost done as well.

1 comment:

  1. Cool to see the pictures from a distance and the steps uncovered. Excellent work, brother!