Well I recently just started a new project in Denver. It is a basement finish that is approximately 700 sq ft. The basement is going to have a bathroom, bedroom, and a living room. The framing is done and the drywall crew started today. I love these projects because they move so quickly! These are the before pictures.

Lee Hill Update







Well its been awhile since I updated what has been going on with this project. We are nearing completion, but I haven't taken any pictures lately so here is the most recent. The plastic tenting on the end of the house is what has to be done to stucco in Colorado in the winter.

Friday, October 30, 2009

Lee Hill update











Well we got a bit slowed down this week on this project since we received about two feet of snow at the house! Even with this said there has once again been lots of progress made in the last few weeks. We passed all of our rough inspections (i.e. electrical, plumbing, hvac, and framing) this past week. The whole house has also been sheeted with osb in preparation for stucco. The new windows are installed and the insulation was finished today. Things are moving quickly now, whic is good since the weather is turning winter like quickly.

Denver Cabinets











I recently was able to break away from the big Lee Hill project and install a custom set of cabinets in a Denver home. Eric built most of the cabinets at his house and we then installed them in one long day. The wall was 24' long and was a mix of moveable shelves and enclosed cabinets.

Thursday, October 8, 2009

Lee Hill Project Framing
















Many things have changed on the project since last time I posted. We have the entire addition framed and many of the new openings framed in the existing house. The roof has ice and water shield on it so we can stay dry now. I also had Mauro and his crew on site again to form and pour the steps and the garage slab. The HVAC rough in is almost done as well.

Tuesday, September 15, 2009

Floor Framing- Lee Hill Project




Well we finally got this project out of the ground and it is starting to look like something. We got the floor system in as well as the perimeter drain and foundation insulation.

Monday, September 7, 2009

Rock Creek Basement
















We completed this basement a couple of months ago, and it came out excellent. We custom built the cabinets and I personally did all the stone work and tile work.

Foundation Poured!







On Friday we finally got the foundation poured after a bit of a hassle in the morning. The driveway is still very steep even after regrading it so the pump truck had to be moved twice so the concrete trucks could get into position. After we got rolling it only took about two hours to pour and place everything. Its good having this done because now we can get moving with the framing!

Excavation Complete/ Foundation begins







After finall moving all the rock and regrading the driveway we poured the footings and formed and poured the foundation walls.

Lee Hill Project

This is the house as we just began to break ground.


We finally broke ground on our newest project three weeks ago. It is a 1300 sq ft addition just outside of Boulder. We ran into quite a bit of rock, but finally got the foundation walls poured last week.