Well I recently just started a new project in Denver. It is a basement finish that is approximately 700 sq ft. The basement is going to have a bathroom, bedroom, and a living room. The framing is done and the drywall crew started today. I love these projects because they move so quickly! These are the before pictures.
Thursday, December 10, 2009
Friday, October 30, 2009
Lee Hill update
Well we got a bit slowed down this week on this project since we received about two feet of snow at the house! Even with this said there has once again been lots of progress made in the last few weeks. We passed all of our rough inspections (i.e. electrical, plumbing, hvac, and framing) this past week. The whole house has also been sheeted with osb in preparation for stucco. The new windows are installed and the insulation was finished today. Things are moving quickly now, whic is good since the weather is turning winter like quickly.
Thursday, October 8, 2009
Lee Hill Project Framing
Many things have changed on the project since last time I posted. We have the entire addition framed and many of the new openings framed in the existing house. The roof has ice and water shield on it so we can stay dry now. I also had Mauro and his crew on site again to form and pour the steps and the garage slab. The HVAC rough in is almost done as well.
Tuesday, September 15, 2009
Monday, September 7, 2009
Foundation Poured!
On Friday we finally got the foundation poured after a bit of a hassle in the morning. The driveway is still very steep even after regrading it so the pump truck had to be moved twice so the concrete trucks could get into position. After we got rolling it only took about two hours to pour and place everything. Its good having this done because now we can get moving with the framing!
Subscribe to: